
Industries · Construction & Building Materials
Building materials by rail.
Heavy freight, lower rate.
Flooring, tile, insulation, roofing, doors and windows in full 40′ and 53′ containers on CN and CPKC. Ontario and Quebec plants to Western builds. Typically 30–50% below full truckload, fuel included.
Get your rate
Origin, destination and container size to start. Your all-in rate, fuel included, in minutes.
RailGateway moves full containers on long-haul lanes across Canada on CN and CPKC, and between Canada and Mexico on CPKC’s rail line. In the US, RailGateway picks up and delivers only along the Mississippi corridor, Chicago to New Orleans.
A rail expert replies. That’s it.
30–50%
Below full truckload on long hauls
All-In Pricing
Fuel Included
6–7 days
Montréal to Calgary, Dock to Dock
The construction & building materials shipping problem
Does rail work for building materials?
Yes, and heavy product is where it works best. Weight barely changes a rail rate if you’re within legal payload, so tile, flooring and fasteners save the most versus truck.
How much does it cost to ship building materials by rail?
Rail is quoted per container, not per pallet or per tonne. On long hauls a full 40′ or 53′ box is typically 30–50% below full truckload. The lane, the box size and the distance to the ramp set the number. Dense freight wins biggest.
Full containers only. Crated, skidded or palletized product. No aggregates. No oversize.

40′ & 53′
CN / CPKC-owned containers
Dock to Dock
Drayage included, both ends
Construction and Building Materials shippers
what they move with us
Full-container freight between plants, DCs and customers, sealed at your dock.
Flooring and tile
Dense, palletized, and the biggest saving versus truck.
Insulation, roofing and drywall
High-cube 53′ boxes for light, bulky product that wastes truck space.
Doors, windows and fixtures
Crated product, sealed at your dock, delivered to the receiving dock.
Not a fit: aggregates, flatcar lumber lifts, oversize structural steel, LTL. We’ll say so at the quote.
Sample lanes we run
Building materials lanes, Dock to Dock.
| Sample Lanes | Typical transit | Rate |
|---|---|---|
| Montréal to Calgary | 6–7 days | Get your rate |
| Toronto to Vancouver | 6–8 days | Get your rate |
| Toronto to Winnipeg | 3–4 days | Get your rate |
| Vancouver to Toronto | 7–9 days | Get your rate |
Sample lanes only. We run long-haul lanes between provinces on CN and CPKC. Transit times are typical dock-to-dock ranges. Nearest ramps: Toronto, Montréal, Calgary, Edmonton, Vancouver. Drayage from your dock to the ramp is in the quote.
Why RailGateway
Why book Building Materials Freight
with RailGateway

30–50% below truckload
Per container, not per pallet. Fuel included. Heavy product pays the same per box as light.
Set schedules
Trains run on set schedules. No driver capacity swings, no seasonal repricing. A delivery window the site can schedule trades around.
About 75% lower emissions
Same container, a quarter of the emissions of road. Helps developers meet green building targets.
Trusted partner of CN Railway & CPKC Railway

Contract rates on CN Rail and CPKC (formerly CP Rail). No volume commitment. We book the railway that fits your lane, your timing and your rate.
Questions we’re asked
Construction and Building Materials shippers ask us…
Can building materials ship by rail in Canada?
Yes. Flooring, tile, insulation, roofing, doors, windows and fixtures move in full 40′ and 53′ containers on CN and CPKC, plant to distributor or plant to builder’s yard.
Is rail cheaper than truck for heavy building products?
Usually by 30–50% on long hauls. Rail is priced per container, so dense product saves the most.
What weight can a 53′ container carry?
Most domestic Canadian lanes allow up to 57,300 lbs in a 53′ high-cube and up to 60,000 lbs in a 40′ dry box. Tile, flooring and fasteners weigh out before they cube out, so the 40′ box is often the right call. Your quote states the payload for your lane.
Do you ship aggregates or bulk?
No. Full containers only. No aggregates, no bulk, no oversize.
How does the product need to be packed?
Crated, skidded or palletized, and secured in the box. Heavy loads blocked and braced. Loaded at your dock, sealed, opened at the receiving dock. We tell you anything else at the quote.
Can I track the container?
Yes. Live tracking dock to dock, and a person who answers the phone.
Can I ship just one container?
Yes. No volume commitment. One box is a booking.
Do I need a rail contract?
No. We already hold network pricing. You book the lane without a volume commitment.
Is fuel included?
Yes. Every rate we quote is all-in, fuel included.
How fast do I get a rate?
Origin, destination and container size. A rail expert replies in minutes.
From the blog: Construction & Building Materials

Rail vs truck shipping cost in Canada: a data-driven B2B comparison

The ultimate guide to CN intermodal: stop bleeding B2B freight margins

Why shipping is so expensive in Canada, and what you can do about it
Related industries
Price your Lane
for Construction & Building Materials Rail Shipping
Origin, destination and container size. Your all-in rate, fuel included, in minutes.
